ENEAGEX
Home
DevelopersAboutContact

Newsletter

Stay Updated

Get the latest updates on renewable energy investments and platform developments.

ENEAGEX Logo

Africa's first investment platform for renewable energy investments. An investment product giving individuals and institutional investors innovative access to clean energy as an asset class.

Investors & Developers

  • Retail Investors
  • Institutional Investors
  • Developers

Company

  • About Us
  • Contact

Contact Info

  • info@eneagex.com
  • +27 68 624 8998
  • Sandton, Johannesburg, South Africa

© 2026 ENEAGEX. All rights reserved.

    For developers & IPPs

    List your operating asset on Africa's renewable energy exchange.

    Submit an operational solar, wind or storage asset for assessment. We return an indicative valuation, a tokenisation structure, and a clear path to listing — so you can recycle capital in months, not decades.

    Submit an asset for assessmentHow the assessment works
    FSCA regulatory guidanceNo upfront costIndicative range within days
    Operational solar PV farm, South African arid landscape
    Why list with ENEAGEX

    Capital that works for your next project, not your last one.

    Recycle capital

    Equity locked in 20–25 year PPAs sits idle. A partial or full listing on ENEAGEX frees that capital to redeploy into your next project — without waiting for the PPA to expire.

    20–25 yrtypical PPA lock-in freed early

    Keep building

    Partial sale, full exit, or a structured token offering — you choose the structure. Retain operational control if you need it, or exit cleanly. The structure fits your strategy.

    Partial or fullsale — you set the terms

    Institutional buyers

    Access verified investors and funds through a regulated marketplace — not ad-hoc bilateral deals that take months to close and leave price discovery to guesswork.

    Regulatedmarketplace, not bilateral negotiation
    What we assess

    A defensible valuation considers everything that drives value.

    We assess eight factors systematically — not because process is a selling point, but because a valuation is only defensible if it can be challenged, interrogated, and reproduced. This is what committee-ready diligence looks like.

    01

    PPA offtaker & counterparty quality

    Eskom / corporate / municipal; creditworthiness and payment track record.

    02

    Remaining PPA tenor & tariff structure

    Escalation clauses, indexation, tariff step-ups, and expiry risk.

    03

    Metered performance history & forecast generation

    Verified P50 generation from metered data and satellite irradiance cross-check.

    04

    Equipment, technology & expected degradation

    Module and inverter specifications, degradation curves, and remaining useful life.

    05

    Cashflows, operating margins & major capex outlook

    O&M cost trajectory, insurance, and material capital expenditure requirements.

    06

    Regulatory standing & wheeling/grid exposure

    NERSA registration, wheeling agreement status, curtailment risk, and grid connection.

    07

    Comparable transactions & REIPPPP tariff benchmarks

    Calibrated against available secondary market transactions and bid-window tariffs.

    08

    Live discount rate marked to the SARB yield curve

    Risk-free rate rebuilt daily from SA 10Y bond yield; project risk premium applied on top.

    Every assessment is independently reviewed and built to be verifiable against traditional valuation methods — faster than a conventional process, without cutting corners. We do not claim audited or guaranteed precision; we deliver a defensible, independently assessed fair-value range.

    The assessment process

    Fast-but-complete — not fast instead of complete.

    The indicative range arrives in days. The full assessment is thorough. Both steps exist because speed without rigour is just guessing — and institutional buyers can tell the difference.

    PPA agreementverified
    Metering history (12 mo)pending
    Grid connection docspending
    Technical specspending
    01Submit

    Provide asset details & documents

    PPA, metering data, technical specs, and financials. Confidential. No upfront cost.

    We review your submission and confirm eligibility within 2 business days.

    P25MedianP75
    R [X]MR [X]MR [X]M

    Indicative range · directional only

    02Indicative range

    Directional valuation within days

    An initial P25–P75 fair-value range from your inputs and our live SARB-marked engine.

    This is a starting point — not an instant output. Typically within 3–5 business days.

    88%
    72%
    100%
    65%
    03Full assessment

    Complete due diligence

    Eight-factor analysis across all the drivers listed above. Independently reviewed.

    A defensible fair valuation — not a desktop estimate. Builds on the indicative range.

    Token structure
    Token count
    [X,XXX]
    Price / token
    R [X,XXX]
    Min. investment
    R [X,XXX]
    Yield estimate
    [X.X]% p.a.
    04Structure & list

    Tokenisation structure and marketplace listing

    Indicative token count × price per token, listing to verified buyers, and settlement on institutional rails.

    You review and approve the structure before anything goes live.

    Directional estimate

    Want a rough number first?

    Enter a few standard parameters for a directional indicative range, drawn from live SARB rates and satellite generation data. It's a starting point — your full assessment refines it across every factor above.

    This tool gives you a directional range — useful for initial sizing and go/no-go thinking.

    It is not a formal valuation. Final fair value is determined through the full eight-factor assessment — submit your asset to begin.

    Submit an asset for assessmentSee the full lifecycle demonstration
    Indicative range — directional estimate only
    Indicative valuation
    50 MW
    12 yrs

    Full engine · live SARB curve · ~60 seconds

    Not a formal valuation. Final fair value is determined through full assessment.

    Eligible assets

    What you can list on ENEAGEX.

    We focus on operational assets with contracted revenue — the assets where a defensible, market-linked valuation is possible and institutional buyers have the clearest path to underwriting.

    Solar PV

    • Operational — generating revenue under a PPA or direct offtake
    • Minimum capacity: ~[5] MW (smaller portfolios considered)
    • South Africa or SADC region grid-connected
    • NERSA generation licence in good standing

    Utility-scale ground mount, C&I rooftop portfolios

    Wind

    • Operational wind farm with metered generation history
    • Grid-connected with wheeling agreement or direct connection
    • Minimum 12 months of verified P50 production data
    • PPA or PLA with creditworthy offtaker

    REIPPPP round assets, independent wind developers

    Storage

    • Battery energy storage systems (BESS) with contracted capacity
    • Operational with demonstrated dispatch and availability data
    • Revenue under ancillary services, arbitrage, or capacity contract
    • Paired with generation asset or standalone — both considered

    Grid-scale BESS, hybrid solar-plus-storage

    Listing criteria summary
    Asset stageOperational — not development or construction
    GeographySouth Africa, SADC region
    RevenuePPA, PLA, or direct offtake in place
    Minimum size~[5] MW or equivalent AUM
    RegulatoryNERSA registration; FSCA guidance applies
    Data≥ 12 months metered production history

    Not sure your asset qualifies? Submit a brief description — we'll confirm eligibility at no cost.

    Submit an asset for assessment
    Submit an asset

    Free the capital in your operating assets.

    ENEAGEX is building Africa's first exchange for operational renewable energy assets. Submit your asset for assessment — no upfront cost, no obligation.

    Submit an asset for assessmentHow the assessment works